Planning a Power BI Project | Learn With The Nerds

Written by Nick Lee | Aug 30, 2026

In this informative session, Nick Lee from Pragmatic Works walks us through essential steps to plan a Power BI project that delivers value efficiently while avoiding common pitfalls. This guide covers everything from understanding self-service and enterprise practices to selecting the right licensing options and optimizing performance. Whether you are a developer, analyst, or executive, this roadmap will help you set clear goals for your Power BI project.

 

Key Takeaways:

  • Self-Service vs Enterprise: Teams often use a blend of both approaches, moving fast with self-service while ensuring governance and scalability with enterprise solutions.
  • Choosing the Right Features: Deliberate choices between Direct Lake, Import, and Direct Query modes are critical to balancing performance and data freshness.
  • Effective Budgeting: A well-planned budget ensures resources are allocated to key areas, including licenses, capacity, training, and governance.
  • Security and Governance: Implementing controls like Row-Level Security (RLS), Object-Level Security (OLS), and Data Loss Prevention (DLP) ensures the integrity of data and compliance across teams.
  • Capacity Management: Monitor performance, optimize models, and scale only when necessary to ensure sustainable growth without performance bottlenecks.
  • CI/CD Deployment: Continuous integration and deployment pipelines provide a reliable way to manage Power BI projects, ensuring consistent changes across environments and reducing manual errors.

Planning for Self-Service vs Enterprise

Nick explains the difference between self-service and enterprise Power BI implementations. Self-service allows individual teams or analysts to quickly build and iterate on their reports, but it can lead to inconsistent metrics and lack of governance over time. In contrast, enterprise solutions provide structured, governed data models that ensure consistency across reports but require more coordination.

Nick recommends a hub and spoke model where the "hub" holds certified, centralized data models, and the "spokes" are domain-specific teams that can build their own reports while sharing insights back to the hub.

Choosing the Right Features for Your Team

Nick emphasizes the importance of selecting the right data ingestion methods. For stable, curated data sets, the import method is the most reliable and predictable choice. However, for more dynamic data, the direct query method may be needed. Direct Lake offers the best of both worlds when using Microsoft Fabric, providing real-time freshness and high performance.

Budget Planning

Setting a realistic budget is essential for the success of any Power BI project. The budget should cover:

  • Licenses (Power BI Pro, Premium Per User, Fabric Capacity)
  • Capacity for data volume, refresh frequency, and concurrency
  • Training and external tools (like DAX Studio and Tabular Editor)
  • Governance to ensure compliance and prevent shadow data

Nick advises starting with a pilot project to better estimate the costs and resource needs before scaling up.

Security Considerations

Security is a crucial aspect of Power BI project planning. Nick discusses four key security layers:

  • Row-Level Security (RLS): Filters data by user role, ensuring each user sees only the data they are authorized to view.
  • Object-Level Security (OLS): Hides specific tables or columns based on user roles, offering an added layer of protection.
  • One Lake Security: Controls access to data assets within Microsoft Fabric, with encryption and auditing capabilities.
  • Sensitivity Labels & DLP: Prevents accidental exposure of sensitive data across Microsoft 365 apps.

Optimizing Performance and Scaling

Nick stresses the importance of optimizing models before scaling up Power BI capacity. This includes:

  • Trimming unused columns and tables
  • Using incremental refresh for large datasets
  • Offloading heavy workloads during peak times

Scaling should only happen after optimization to ensure you're not paying for unnecessary resources.

CI/CD Deployment for Power BI

Continuous integration and deployment (CI/CD) are essential for managing Power BI projects at scale. By integrating Power BI with version control (e.g., GitHub or Azure DevOps), teams can ensure reliable deployment between environments (dev, test, production), automate tests, and roll back changes if necessary. This approach improves collaboration and reduces manual errors in BI workflows.

Conclusion

By planning your Power BI project with a focus on features, security, governance, and optimization, you can deliver impactful insights faster while ensuring scalability and consistency. A well-thought-out strategy, combined with the right tools and practices, will help your team make informed decisions and avoid costly mistakes in the long run.