<img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=612681139262614&amp;ev=PageView&amp;noscript=1">
Skip to content

Need help? Talk to an expert: phone(904) 638-5743

GTCH2

Coordinate Every Test, Protect Every Project.

Construction teams often coordinate geotechnical testing through spreadsheets, calls, emails, and disconnected laboratory reports. These fragmented processes can cause missed tests, delayed results, unresolved failures, compliance gaps, and costly construction delays.

Geotechnical Testing Coordination Hub brings testing requests, technician assignments, field results, laboratory samples, engineering reviews, and compliance insights into one connected platform. Construction teams can coordinate testing activities, resolve failed results faster, and protect project schedules using Power Apps, Power Automate, Dataverse, and Copilot Studio.

  • Centralize every testing request, with guided request forms, project locations, test methods, technician assignments, laboratory routing, real-time status tracking, and supporting documents.

  • Prevent construction delays, with automated scheduling, overdue-result alerts, failure escalations, retest workflows, engineering approvals, and construction area release notifications through Power Automate.

  • Strengthen testing compliance, with technician qualification tracking, equipment calibration alerts, sample chain-of-custody records, missing-document warnings, and configurable compliance insights.

  • Improve field visibility, through interactive site maps, animated charts, mobile data capture, QR sample tracking, result trends, blocked-area monitoring, and Copilot-powered project summaries.

97% of fortune 100 companies trust us

Thousands of companies use Pragmatic Works to learn how to best develop and administer their AI, Power Platform and data systems.

hess
cisco
tyson
rooms-to-go-logo-vector
1-e1605215212348
BGSU-Logo-RGB-JPG
c6526571fbfe5f5db10702af54966e06-g575771g14x91
pfizer